Many of our job sites are vacant, unfinished buildings across the country. But on the off chance that we get the opportunity to install ERRCS in an operating business, we never take it for granted. The SpeakEZ crew is highly experienced and handles such situations better than anyone else in the industry.  Thus, we were the integrator of choice for an ERRC system installation at the Disney Digital Center 3. However, something we wanted to keep top of mind in this job is to seamlessly work alongside their employees during the installation.

This facility has dozens of live ON-AIR broadcast studios for Disney, Fox Sports, and ESPN. Editing and live program control is a 24/7 operation at this 187,000 square foot, state-of-the-art facility in The Woodlands, Texas. A recent building addition and subsequent “testing” for two-way radio signal strength revealed the need for boosting to bring this facility up to code.  An occurrence that comes up often when existing buildings go through renovation/remodeling. When permits are pulled, the Fire Marshal will require testing near completion.

 

Disney Digital Center 3 studios in The Woodlands, Texas, is a 187,000 square foot state-of-the-art facility.

The beautiful main lobby of the facility.

A portion of just ONE of the dozens of live “on-air”/editing and production studios.

Part of another studio where we had to work around employees, and very quietly.

A string of satellite dishes that bring live feeds from around the country to this broadcast facility.

A SpeakEZ crew member running cable at Disney. ERRC systems use cable like this to take radio signals from an antenna on the roof and then distribute the emergency responder radio signals throughout the building.

A SpeakEZ crew member in the “Fire Room” at Disney. These rooms store vital communication, fire alarm, and our ERRCS equipment. The rooms are built to withstand and be protected from fire in the case of an emergency.

One of our SpeakEZ trucks is on site at Disney in The Woodlands.

Share